Used AITO M9 2024 extended range Ultra version 52kWh 6-seater version

Original price was: $64,329.00.Current price is: $63,639.00.

Vehicle File
Location
Shenzhen
MileageYearEngineTrans.FuelSteering
29,300KMApril 2024Extended range 152HPATPetrolRight
PAY NOW
SKU: 540 Category: Tags: , , ,
Basic parameters
Model NameWenjie M9 2024 Extended Range Ultra Edition 52kWh 6-Seater
Manufacturer’s suggested retail price (RMB)549,800
ManufacturersAITO Asks the World
levellarge SUV
Energy typeRange extender
Environmental standardsNational VI
Launch dateDecember 2023
WLTC pure electric range (km)233
CLTC pure electric range (km)275
Fast charging time (hours)0.5
Slow charging time (hours)5
Fast charging percentage20-80
Maximum power (kW)365
Maximum torque (N·m)675
engine1.5T 152hp L4
Electric motor (Ps)496
gearboxElectric vehicle single-speed gearbox
Length * Width * Height (mm)5230*1999*1800
Body structure5-door 6-seater SUV
Maximum speed (km/h)200
Official 0-100km/h acceleration (s)4.9
Whole vehicle warrantyFour years or 100,000 kilometers
First Owner Warranty Policy–
Body
Length (mm)5230
Width (mm)1999
Height (mm)1800
Wheelbase (mm)3110
Front track width (mm)1707
Rear track width (mm)1713
Approach angle (°)18
Departure angle (°)20
Minimum turning radius (m)5.8
Body structureSUV
Car door opening methodHinged door
Number of car doors5
Number of seats6
Fuel tank capacity (L)65
Trunk volume (L)206-716
Drag coefficient (Cd)0.279
Curb weight (kg)2650
Maximum load capacity (kg)3100
engine
Engine ModelH15RT
Displacement (mL)1499
Displacement (L)1.5
Intake formTurbocharged
Engine layoutHorizontal
Cylinder arrangementL
Number of cylinders4
Number of valves per cylinder4
Gas distribution mechanismDOHC
Maximum horsepower (Ps)152
Maximum power (kW)112
Maximum power speed (rpm)–
Maximum torque (N·m)205
Maximum torque speed (rpm)–
Maximum net power (kW)110
fuel formRange extender
fuel gradeNo. 95
fuel supply methodMulti-point fuel injection
Cylinder head materialaluminum alloy
Cylinder block materialaluminum alloy
Environmental standardsNational VI
electric motor
Motor typeAC/Asynchronous followed by permanent magnet/Synchronous
Total power of electric motors (kW)365
Total power of the electric motor (Ps)–
Total torque of the electric motor (N·m)675
Maximum power of the front motor (kW)165
Maximum torque of the front motor (N·m)315
Maximum power of the rear motor (kW)200
Maximum torque of the rear motor (N·m)360
Number of drive motorsDual motors
Motor layoutFront + Rear
Battery Typeternary lithium battery
Battery cell brandsCATL
Battery cooling methodLiquid cooling
WLTC pure electric range (km)233
CLTC pure electric range (km)275
WLTC combined range (km)1239
Battery energy (kWh)52
Energy consumption per 100 kilometers (kWh/100km)–
Battery pack warrantyEight years or 160,000 kilometers
Fast charging functionsupport
Fast charging time (hours)0.5
Slow charging time (hours)5
Fast charging capacity (%)20-80
gearbox
Number of gears1
Transmission typeFixed gear ratio gearbox
AbbreviationElectric vehicle single-speed gearbox
Chassis Steering
driving methodDual-motor four-wheel drive
Four-wheel driveElectric four-wheel drive
Central differential structure–
Front suspension typeDouble wishbone independent suspension
Rear suspension typeMulti-link independent suspension
Assistance TypeElectric Assist
Vehicle body structureLoad-bearing
Wheel Braking
Front brake typeVentilation disc
Rear brake typeVentilation disc
Parking brake typeElectronic parking brake
Front tire specifications265/45 R21
Rear tire specifications285/45 R21
Spare tire specifications–
STEP1
Select the vehicle and get a CIF quote.
STEP2
Get proforma invoice agreement and pay.
STEP3
Select the fastest shipping method.
STEP4
Customs clearance, delivery.
Step 1 Select the vehicle and get a CIF quote.
Search for a vehicle you would like to purchase.
Using “Get a Price Quote”Receive a price quotation and a professional and detailed vehicle inspection report by email. In case you have questions, reply to the email with quotation.
If you're satisfied with the given price and condition, let us know your purchase intent. We will then place your order and prepare the invoice needed for payment (Proforma Invoice).
If you haven't decided yet, you can also add staff members on Telegram or WhatsApp for more convenient and faster communication.
Step 2 Get proforma invoice agreement and pay.
Once you receive the proforma invoice, you can place your order and make payment by adding it to your cart. After payment, please send us your payment receipt via email, WhatsApp, or Telegram.
Step 3 Select the fastest shipping method.
When payment is received, we will select the fastest shipping method based on your delivery address and send you a shipping schedule for your order.
After vehicle is shipped, CARERL will prepare the original documents required for import customs clearance including Bill of Lading. The documents will be delivered by Express to your preferred address or your customs clearance agent.
Step 4 Customs clearance, delivery.
Receive your vehicle at the Agreed Destination. You are required to clear vehicle at the customs, usually through a clearing agent.
Enjoy driving your new car!

Reviews

There are no reviews yet.

Be the first to review “Used AITO M9 2024 extended range Ultra version 52kWh 6-seater version”

Your email address will not be published. Required fields are marked *